In May, a customer from the Philippines purchased two solar piling machines from YG Machinery for a large-scale photovoltaic project in Luzon. The project required thousands of steel piles to be installed within a short construction schedule, and traditional manual piling methods could not meet the demand.
Solar Piling Machines Parameters
Hydraulic photovoltaic pile driver | |||
Overall dimensions | 4700*2100*2800mm | Drill pipe rotational speed | 180r/min |
Track shoe width | 400mm | gradability | 30° |
motor | 4108 | rock hardness | 6-20F |
Drilling diameter | 80-500mm | Slide tilt angle | 120° |
Drilling depth | 0-6m | Drill arm swing angle | left and right150° |
Reducer torque | 13000n.m | Slide swing angle | left and right40° |
Mainstream pump | triple pump | Driving speed | 0-3km/h |
oil pump | 40/40/32 |
Crawler photovoltaic pile driver | |||
Overall dimensions | 4700*2200*2800mm | Hydraulic hammer flow | 50-110L/min |
Track shoe width | 400mm | Impact frequency | 350-800BMP |
motor | 4108 | Hydraulic system pressure | 25mpa |
Generator power | 88kw Motor | Strong wind for heat dissipation | yes |
Drilling depth | 0-6m | oil pump | 40/40/32 |
Drilling diameter | 80-600mm | Driving speed | 3km/h |


Customer’s Challenges
Before choosing YG, the Philippine customer faced several difficulties:
- Complex soil conditions: The project site contained a mix of sandy soil and hard layers, which made manual or light equipment inefficient.
- Tight deadlines: The solar farm needed to be connected to the grid before the rainy season.
- High labor costs: Hiring a large workforce for manual piling increased expenses significantly.
- Durability concerns: Equipment needed to withstand the hot and humid local climate.
YG Solution: Reliable Solar Piling Machines
YG recommended two sets of advanced solar pile drivers designed for high efficiency and adaptability. Key advantages included:
- High efficiency: Each photovoltaic pile driver can install 200–300 piles per day, reducing project time by nearly 30%.
- Adaptability: Powerful hydraulic systems allow the machines to work in soft soil, gravel, and even partially rocky ground.
- Labor savings: Only two operators are needed, cutting labor costs by nearly half.
- Durable design: Built to perform reliably in tropical climates with minimal maintenance.


Project Results in the Philippines
After introducing the two machines, the construction team noticed immediate improvements:
- Installation speed was three times faster compared to manual piling.
- The project was completed two weeks ahead of schedule, avoiding delays during the rainy season.
- Overall costs were reduced by approximately 20% due to labor and time savings.
The customer was highly satisfied and is considering an additional solar pile driver for sale in another renewable energy project.
FAQ about Solar Pile Driver
- How many piles can a solar piling machine install per day?
Typically 200–300 piles, depending on soil conditions. - Can the machine handle rocky or mixed soil?
Yes, our solar pile driver is equipped with a strong hydraulic hammer for different terrains. - How many people are required to operate one machine?
Just two operators are enough for efficient operation. - What is the fuel consumption?
On average, one machine consumes about 6–8 liters of diesel per hour. - Do you provide after-sales service in the Philippines?
Yes, YG provides online technical support, spare parts supply, and guidance for overseas projects.
Why Choose YG Machinery?
- Over 20 countries served with renewable energy equipment.
- Reliable quality with competitive prices.
- Professional support for overseas delivery and installation.
If you are looking for a solar pile driver for sale that is efficient, durable, and cost-effective, YG Machinery can provide the right solution for your solar farm project.