In May, a construction company in Luzon, Philippines, launched a large-scale photovoltaic project and needed to drive thousands of steel piles within a tight schedule. To boost efficiency, the contractor turned to YG Machinery and purchased two solar piling machine. Compared with traditional manual or low-efficiency piling methods, the YG solar pile driver increased piling efficiency by 30–50%, helping the contractor stay on schedule despite tight project timelines. The client praised their performance, reliability, and YG’s responsive technical support.
Solar Piling Machine Parameters
| Skid-Mounted Solar Pile Driver with Hydraulic Adjustable Support Legs | |||
| Overall Dimensions | 4700 × 2200 × 2800 mm | Crawler Plate Width | 300 mm |
| Engine | Yuchai 4108 | Rated Power | 88 kW |
| Max Drilling Depth | 6 m (extendable drill rod) | Max Drilling Diameter | 400 mm |
| Main Pump | Triple pump | Reducer Output Torque | 13,000N.m |
| Drill Rod Speed | 180 r/min | Hydraulic Pump | 40 / 40 / 32 |
| Applicable Rock Hardness | 6–20 F | Climbing Angle | 45° |
| Drilling boom swing angle | Left & Right 150° (±75°) | Sliding Frame Pitch Angle | 120° |
| Travel Speed | 5 km/h | Sliding Frame Swing Angle | Left & Right 40° |
| Machine Weight | 6.5 T | Crawler Height Adjustment Range | 80–120 mm |
| Hydraulic Photovoltaic Pile Driver-Rotary Drilling Type/DTH types | |||
| Parameter | Specification | Parameter | Specification |
| Overall Size | 4700 × 2100 × 2800 mm | Rock Hardness (The hardness of rocks) | 6–20 F |
| Track Shoe Width | 400 mm | ||
| Engine | Yuchai four cylinder | Travel/Walking Speed | 5 km/h |
| Maximum Drilling Depth | 6 m (can install longer drill pipes) | Drill Pipe Speed | 180r/min |
| Maximum Drilling Diameter | 400mm | Sliding Frame Pitch Angle | 120° |
| Reducer Torque | 13,000N.m | Climbing Angle | 30° |
| Oil Pump | 40 / 40 / 32 | Drilling boom swing angle | Left & Right 150° (±75°) |
| Overall Weight | 6.5 T | Slide swing angle | Left & Right 40° |
| Crawler Solar Pile Ramming Machine – Hydraulic Hammer Type (requires compressor for rock drilling) | |||
| Parameter | Specification | Parameter | Specification |
| Overall Size | 4700 × 2100 × 2800 mm | Track shoe width | 400mm |
| Power Head | Hydraulic power | Engine | Yuchai four cylinder (85 kW) |
| Overall Quality | 6.5 T | Maximum drilling depth | 6m (can connect drill rods) |
| Maximum Drilling Diameter | 350 mm | Hydraulic hammer flow | 50–110 L/min |
| Impact Frequency | 350–800 bpm | Hydraulic system pressure | 25–30 MPa |
| Oil Pump | 40/40/32 | Travel speed | 5 km/h |
| Climbing Angle | 30° | Strong wind heat dissipation | Large radiator |


Customer’s Challenges
Before choosing YG, the Philippine customer faced several difficulties:
- Complex soil conditions: The project site contained a mix of sandy soil and hard layers, which made manual or light equipment inefficient.
- Tight deadlines: The solar farm needed to be connected to the grid before the rainy season.
- High labor costs: Hiring a large workforce for manual piling increased expenses significantly.
- Durability concerns: Equipment needed to withstand the hot and humid local climate.
YG Solution: Reliable Solar Piling Machine
YG recommended two sets of advanced hydraulic hammer type solar pile drivers designed for high efficiency and adaptability. Key advantages included:
- High efficiency: Each photovoltaic pile driver can install 200–300 piles per day, reducing project time by nearly 30%.
- Adaptability: Powerful hydraulic systems allow the machines to work in soft soil, gravel, and even partially rocky ground.
- Labor savings: Two operators can run the machine, cutting labor costs by nearly half..
- Durable design: Built to perform reliably in tropical climates with minimal maintenance.


Project Results in the Philippines
After introducing the two machines, the construction team noticed immediate improvements:
- The construction team installed piles three times faster than they could with manual methods.
- They finished the project two weeks ahead of schedule and successfully avoided delays during the rainy season.
- They also reduced overall costs by approximately 20% through labor and time savings.
The customer expressed strong satisfaction and is now considering purchasing another solar pile driver for an upcoming renewable energy project.
FAQ about Solar Pile Driver
- How many piles can a solar piling machine install per day?
Typically 200–300 piles, depending on soil conditions. - Can the machine handle rocky or mixed soil?
Yes, our solar pile driver is equipped with a strong hydraulic hammer for different terrains. - How many people are required to operate one machine?
Just two operators are enough for efficient operation. - What is the fuel consumption?
On average, one machine consumes about 6–8 liters of diesel per hour. - Do you provide after-sales service in the Philippines?
Yes, YG provides online technical support, spare parts supply, and guidance for overseas projects.
Why Choose YG Machinery?
- Over 20 countries served with renewable energy equipment.
- Reliable quality with competitive prices.
- Professional support for overseas delivery and installation.
If you are looking for a solar pile driver for sale that is efficient, durable, and cost-effective, YG Machinery can provide the right solution for your solar farm project.
In addition, YG factory’s solar pile driver machines were also shipped to Argentina and received good feedback from customers.